MANUFACTURING · ROOFTOP PV

Rapiscan Systems.

MANUFACTURING · STOKE-ON-TRENT

Aerial view of the Rapiscan Systems Stoke rooftop solar installation

The project

Director-led CAD design maximising yield on a complex industrial roof, the first of three Rapiscan installations Green Tech Hub has delivered.

167 kWp
system
ROI 4 yrs 8 mos
outcome
DOCUMENTED OUTCOMES
≈£7,436
Annual saving
4 yrs 8 mos
Full return
74,000 kg
CO₂ avoided / yr
≈£400,000
20-yr net benefit

Figures from Green Tech Hub's client case-study document for this project.

Watch the install

On the roof

Your building could be next

Get your free, no-obligation quote

Commercial solar, battery, EV or any electrical work — no pressure.