MANUFACTURING · REPEAT CLIENT
Rapiscan Systems, Building 2.
MANUFACTURING · STOKE-ON-TRENT
The project
Rapiscan came back: a second rooftop array on the neighbouring building at the Stoke site, delivered in 2026 on the strength of the first.
Second building
system
Repeat client
outcome
On the roof
Your building could be next
Book a free Business Energy Survey, half-hourly consumption analysis, CAD roof design and a fully costed proposal for your site.
Get your free, no-obligation quote
Commercial solar, battery, EV or any electrical work — no pressure.


