Solihull is not the West Midlands stereotype. Where the Black Country runs on foundries and sheds, Solihull runs on offices, business parks and distribution units, and that changes the arithmetic of a solar system in one specific way: the car park matters almost as much as the roof. This worked example takes a 100 kWp array on a Solihull office or business-park unit and runs the numbers on the official figures only.
Step one: what the roof makes
PVGIS, the European Commission’s yield model, puts a 4 kWp south-facing array at 35 degrees in Solihull at 3,881 kWh a year with 14% system losses, which is 970 kWh per kWp. A 100 kWp array therefore generates roughly 97,000 kWh a year. Flat and near-flat office roofs are usually mounted at a shallower pitch on ballasted frames to protect the membrane, which trims the figure slightly; a profiled steel deck on a distribution unit at Monkspath or Blythe Valley is closer to the model.
Step two: what it costs
The Department for Energy Security and Net Zero records the total installed cost of every MCS-certified system. For the West Midlands in 2025/26 the mean was £1,233 per kW for 10 to 50 kW systems across 1,181 installations. DESNZ publishes no band above 50 kW because the jobs vary too much to average, but cost per kW keeps falling with size, so £123,300 for 100 kWp is a ceiling for a straightforward roof rather than a quote. What moves it is the roof: ballasted non-penetrating mounting on single-ply, structural strengthening on an older frame, or a long cable run to the switchroom. The structural report and the G99 application to the network operator are in our fixed price; ask whether they are in anyone else’s.
Step three: what it saves
DESNZ’s quarterly energy prices put the average non-domestic electricity price in the first quarter of 2026 at 24.14p per kWh including the Climate Change Levy, which self-generated electricity does not attract. The variable is self-consumption.
An office using 60% on site. 58,200 kWh displaces grid power at 24.14p, about £14,050 a year. The 38,800 kWh exported at a business export rate of around 12p adds about £4,650. Total: roughly £18,700 a year, a simple payback of about 6.6 years on the average cost.
The same office with staff EV charging. Business parks are where cars sit under the array for eight or nine hours across the generating window: around 10,000 people work at Birmingham Business Park and roughly 3,500 at Blythe Valley. If workplace charging lifts self-use to 80%, 77,600 kWh displaces grid power, about £18,730, and 19,400 kWh exported adds about £2,330. Total: roughly £21,060 a year, a payback of about 5.9 years. Every unit put into a car instead of the grid is worth the full tariff rather than the export rate, which is why we design EV charging and solar together on business parks rather than one after the other.
After tax. The capital cost qualifies for the Annual Investment Allowance at 100% up to £1m, so for a £123,300 system the whole cost is set against profits in year one; above the cap, companies can use the 50% first-year allowance. Solar is special-rate plant and is excluded from full expensing. In England, renewable plant is also left out of a building’s rateable value until 31 March 2035.
Why Solihull is a good place to do this
The borough’s stock is weighted to offices and business parks: Birmingham Business Park covers 148 acres and 2.4 million sq ft with more than 150 businesses; Blythe Valley Park holds over 25 companies in 122 acres off the A34; Monkspath Business Park comprises 42 warehouse units totalling 375,000 sq ft with a minimum 6 m eaves. JLR’s Lode Lane plant, around 300 acres and more than 10,000 people, anchors a supply chain that increasingly has to answer Scope 3 questions from its customer, and metered on-site generation with MCS documentation is a clean answer.
There is precedent at scale on the borough’s boundary. Birmingham Airport commissioned a 6.8 MW solar farm of more than 12,000 ground-mounted panels at a cost of £9.7m, supplying at least 20% of the airport’s electricity and saving around 1,285 tonnes of CO2 a year. And the policy direction is set: Solihull Metropolitan Borough Council recognised a climate emergency in October 2019, committing the borough to net zero by 2041 and its own operations to 2030, and its Local Plan attaches significant weight to low-carbon and renewable energy schemes.
The lease question
Most Solihull business-park occupiers lease rather than own, and that stalls more schemes than roof condition does. A tenant with six years left on a ten-year lease is buying a 25-year asset; a landlord who installs it is spending capital on a bill they do not pay. The workable structures are a landlord-funded system recovered through the service charge or a rent uplift, a licence to alter with an agreed dilapidations position, or a funded arrangement where a third party owns the array and sells you the output. We will say which fits your lease before anyone climbs on the roof; the detail is on our commercial solar Solihull page, and the commercial solar West Midlands page covers the wider region.
Sources
- Yield: European Commission JRC, PVGIS 5.3, Solihull, 4 kWp south-facing at 35 degrees, 14% system loss: re.jrc.ec.europa.eu/pvg_tools/en/
- Costs: DESNZ, Solar PV cost data, 2025/26 Total Installed Cost workbook, “Regional costs (TIC)”: gov.uk/government/statistics/solar-pv-cost-data
- Grid price: DESNZ, Quarterly energy prices, table 3.4.2, Q1 2026: gov.uk, gas and electricity prices in the non-domestic sector
- Capital allowances: gov.uk/guidance/check-if-you-can-claim-full-expensing-or-50-first-year-allowances
- Rateable value exclusion to 31 March 2035: S.I. 2022/405
- Birmingham Business Park: birminghambusinesspark.co.uk; Blythe Valley Park: blythevalleypark.co.uk; Monkspath Business Park estate brochure: Canmoor via Savills
- JLR Solihull plant: JLR Media Newsroom
- Birmingham Airport solar farm: Birmingham Airport Net Zero Carbon Plan / Airport World
- Solihull Metropolitan Borough Council, Climate Emergency and Climate Change Action Plan 2026–2030: solihull.gov.uk
- Permitted development for commercial rooftop solar: GPDO 2015, Schedule 2, Part 14